Electrical Engineer
- Due No Due Date
- Points 100
- Submitting a text entry box or a file upload
You are an electrical engineer that has been contacted by a large corporation to increase profit margins by reducing energy cost. You must identify energy wasters by studying the current electrical schematics of the facilities. Once you have identified where and how the current electrical system needs to be upgraded to reduce energy cost, you will draw new schematics for each facility that will outline where and how the current electrical system needs to be upgraded to reduce energy cost, you will draw new schematics for each facility that will outline where and how the current electrical system needs to be upgraded to reduce energy cost and thus increase profit margins. Once all designs have been completed you will use a multimedia presentation or other medium to present your finding to the company’s board of directors.
Save your work in the appropriate place on the network. Then upload your files to this assignment link by clicking the Submit Assignment button in the upper right hand corner of this window. Proofread all work before you submit it.