Rock-a-Bye Baby
- Due No Due Date
- Points 100
- Submitting a text entry box or a file upload
You are an industrial engineer in Onset Manufacturing facility. Onset Manufacturing manufactures baby cribs. The general manager has discussed with you his concern about the cycle time to manufacture a crib. He requested that you make recommendations on how to decrease the cycle time. In your review of the processes to manufacture a crib, you notice that the process to bolt the front panel to the legs of the crib is time consuming. Investigate installing a robot to assist with this process. Compile your results and comparative analysis, including type of robot, costs, and time-saving information, for your recommendations to the general manager. Present your recommendations through multimedia or some other product approved by your instructor.
When you complete your file, save it to the appropriate place on the network. You will then upload the file to this assignment link by clicking the Submit Assignment button in the upper right hand corner of this window. Proofread your work carefully before you submit it.